UGT Lysimeter station

Our lysimeter stations in the patented containment design (patent no.: 199 07 463) are available to you as single or multiple stations. They comprise one or more lysimeter vessels with a diameter from

  • Product Name:UGT Lysimeter station
  • Maunufactor:UGT
  • Country:DE

Our lysimeter stations in the patented containment design (patent no.: 199 07 463) are available to you as single or multiple stations. They comprise one or more lysimeter vessels with a diameter from 500 mm. The lysimeter depth is variable depending on the lysimeter diameter.

A lysimeter station consists of:

A pressure water-tight PE-HD welded construction with (common) base plate and cover plate with openings for the lysimeters

PE-HD lysimeter outer vessel with an outer diameter of 1,380 mm

Single lysimeter with variable lysimeter depth and cross-sectional area

Delivery and installation of the lysimeter station

Your lysimeter station will be delivered by a freight forwarder and installed at your desired location by our trained UGT personnel. The installation of your lysimeter station includes:

Excavation of the pit

Preparation of the concrete subgrade

Placement of the lysimeter station and backfilling

Installation of the load triangles

Insertion of the lysimeter vessels

Professional installation of the weighing equipment

Professional installation of the sensors

Installation of the data acquisition technology and the power supply

Installation of the radio data transmission

Commissioning and handover

Instruction in the function of the entire station

Maintenance and service of the lysimeter station

In order to be able to ensure a continuous recording of the measurement data and thus to avoid possible data failures, we recommend a maintenance of the complete system twice a year. Our maintenance and service includes

Functional test

Plausibility tests of all sensors based on the data records

Checking the calibration function of the sensors, recalibration if necessary

If necessary, filling of tensiometers that have run dry (removal, cleaning, filling and reinstallation of the sensors)

Check of the control functions

Check of the data acquisition and transmission unit

Check of the power supply

Cleaning and checking of the level controls

If defects are found during maintenance that cannot be repaired on site or if device